Monday, November 25, 2024

Himachal to build 1060 Km roads with Geo Synthetic technique

Himachal to build 1060 Km roads with Geo Synthetic technique

Taruni Gandhi, Chandigarh : In a days to come, for the first time in Himachal, the Public Works Department will build roads using world-class technology called Geo Synthetic technology. It has got the approval of the state government. Now all the roads will be built using Geo-synthetic technology. May onwards the work on this project would start at face pace. On Monday, there was a discussion on the quality of roads and their longevity with the use of this technology.

Public Works Department has prepared the draft of roads

The Public Works Department has prepared the draft of 1060 km of new roads in the state. The construction of these roads will start from next month. Along with this, the department is also going to start the work of making 2065 km of roads on a war footing.

On Monday, several meetings were held simultaneously in the Secretariat under the leadership of the Chief Minister of the department. These meetings have been organized to implement the decisions taken in the budget. In these, all those decisions were brainstormed, which have been included in the budget by the state government.

The Himachal government has made a provision of Rs 4,373 crore in the budget for the Public Works Department. With this money, 1060 km of new motorable roads, 2065 km of paved roads, 990 km of drains, 75 bridges constructed at different places across the state, 80 villages of 20 panchayats and 22 abadis will be covered. A target has been set to connect with it, while the maintenance of 2200 km of roads is also included.

Himachal to build 1060 Km roads with Geo Synthetic technique
Himachal to build 1060 Km roads with Geo Synthetic technique

After completion of the work, the length of motorable roads will increase to 40,000 kms, while the length of paved roads will increase to 34,000 kms. Along with this, the draft of the third phase of Pradhan Mantri Gram Sadak Yojana has also been discussed in the meeting. The second phase of Pradhan Mantri Gram Sadak Yojana will end in September this year, while the central government is churning for the third phase.

Ajay Gupta, Chief Engineer, PWD said that PWD would soon start the work of implementing the budget announcements. The decisions which were related to the department during the budget have been brainstormed. Now the work of construction, maintenance and improvement of roads will be started.

Ice will melt with calcium chloride brine The Public Works Department will no longer spend money on the purchase of large machinery in snow-affected areas, but such products will be procured, using which the snow can be easily melted. For this, the department will use calcium chloride brine in the coming days. Using this the snow will easily melt and the road will be restored in no time.

Read More : RR Win the Match By 7 Runs राजस्थान ने कोलकाता को 7 रनों से हराकर मैच को अपने नाम किया

Connect With Us : Twitter | Facebook Youtube

- Advertisement -
Harpreet Singh
Harpreet Singh
Content Writer And Sub editor @indianews. Good Command on Sports Articles. Master's in Journalism. Theatre Artist. Writing is My Passion.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Popular

More like this
Related

Paralympics Games Paris 2024: मनीष नरवाल ने भारत के लिए जीता सिल्वर मेडल 

India News (इंडिया न्यूज), Manish Narwal Wins Silver Medal: पेरिस पैरालंपिक...

IPL 2025: MI को छोड़ सकते है सूर्यकुमार यादव, इस टीम के बनेंगे कप्तान

India News (इंडिया न्यूज), Suryakumar Yadav: सूर्यकुमार यादव टी20 के...

Manu Bhaker के इस अंदाज के कायल हुए लोग, वीडियो हुआ वायरल

ndia News (इंडिया न्यूज), Manu Bhaker Dance Video: पेरिस ओलंपिक...

WTC Points Table:पाकिस्तान की टीम को लगा बड़ा झटका ,अंक तालिका में बदलाव

India News (इंडिया न्यूज़), WTC Points Table: टेस्ट मैच में...